Projects

You are here

Hester Orchards

Hester Orchards, located in Farmersville, CA, has a rich family tradition with deep roots in California orchard agriculture. The early history of the ranch was prune orchards, walnut orchards, cotton production and grazing beef cattle. Hester Orchards production rapidly evolved into stone fruit (plums, peaches, nectarines) and walnuts. Walnut harvesting and dehydrating became an integral part of their operation at that time and continues to be so today. 

  • 366 kilowatt Ground/Fix Tilt System
  • Millions of dollars in lifetime utility savings
  • Produces approximately 600,000 kilowatt hours of clean, renewable energy each year

BENEFITS

  • Low, stable rates locked in for 25 years
  • 600,000 kilowatt hours per year offsets CO2/greenhouse gas emissions equivalent to:

    • 89.9 passenger cars driven per year
    • 1,019,649 miles driven by an average passenger vehicle
    • 44.9 homes powered for an entire year

 

Calcom Solar, Contractors  Solar Energy, Visalia, CA

Contact Us

Latest News

D’Arrigo California Adds 1.1 Megawatts (MW)...

CalCom Solar D'Arrigo Bros Salinas CA Phase 3

January 22, 2018

Salinas, CA -- D’Arrigo California, a premier grower, packer and shipper of quality...

CalCom Solar Offers Energy Savings at 2017...

CalCom Solar Offers Energy Saving 2017 Almond Conference Sacramento

December 20, 2017

AgNet West interviewed Dylan Dupre, CEO of CalCom Solar, at the 2017 Almond...

CalCom Solar Named One of America’s Fastest-...

CalCom Solar once again in the Inc. 5000 as One of America’s Fastest-Growing Private Companies

August 16, 2017

For the Second Year, CalCom Solar Ranks in the Top 25 of the Inc. 5000 VISALIA, CA...